Tightening Specifications:
| Component | Tightening Specification |
|---|---|
| Bolts -A- | 8 Nm |
-- Install the bracket -C- with the High-Voltage Heater (PTC) - Z115-.
TIGHTENING SPECIFICATIONS:
| Component | Tightening Specification |
|---|---|
| Bolts -A- | 8 Nm |
| Bolts -B- | 20 Nm |
-- Re-install are removed or loosened components.
-- If necessary, fill the coolant in the coolant expansion tank for the engine coolant circuit. Refer to COOLANT, DRAINING AND FILLING [CNSB, CNTC, CYFB] (DI - 1.8L/2.0L) / COOLANT, DRAINING AND FILLING WITHOUT COOLING SYSTEM CHARGE KIT - ELECTRIC VACUUM PUMP:VAS6096/2 (TDI - 1.6L/2.0L) .
-- Remove the :3094 and reinstall all removed or loosened components.
-- Energize the voltage supply to the high-voltage system. Refer to the appropriate service information .
-- After installing the High-Voltage Heater (PTC) -Z115- switch on the ignition and prepare the ready mode (the engine must not run), set the A/C system to the maximum heating output and let the A/C system run for two minutes at this setting.
